Grafton High School; Grafton, MA

NV5 provided full OPM services for the new Grafton High School, which addressed the significant growth that occurred in Grafton. NV5 developed a set of objective criteria to analyze alternative site strategies, ultimately resulting in the selection of the optimal solution which allowed for the reuse of the existing high school for an upper middle school. NV5 developed a phasing plan which allowed the athletic fields to be completed for use by the school, which remained in full operation during adjacent construction activities. NV5 assisted the Massachusetts School Building Authority (MSBA) Designer Selection Panel in choosing the Architect and the Town in determining to use the Construction Manager (CM) at-Risk delivery method, and in selecting a CM, at-Risk.

Building Area Project Cost Delivery Method Scope
186,000 SF $72.4M CM@R Owner’s Project Manager