Projects
Copyright Greg West Photography

Foundry Place Parking Garage

NV5 provided MEP/FP engineering design services for construction of a new parking garage.

The project included a 200,000 SF, five-story garage with 600 spaces on Foundry Place off of Deer Street, and a 5,000 SF tenant fit-out area requiring separate fire protection and plumbing services.

Services included:

  • Connections for auto gates, controls and pay stations
  • Deck washing system
  • Domestic water service
  • Electrical service to garage
  • Emergency power for lighting, sanitary booster pump and elevator
  • General power to garage
  • Fire alarm system
  • HVAC (air conditioning for elevator machine room, heating for water service room, electrical room, telephone/data room, elevator hoisting and railroad office)
  • Manual dry standpipe system
  • Storm drainage from roof level

Storm and water piping system

Location

Portsmouth, NH

Client

City of Portsmouth (owner)
Walker Consultants (parking designer)

Services

Key Facts

  • Project size: 200,000 SF
  • Project cost: $26.2 million