Search
Archives

Commercial Zoning Reports & Their Alternatives: ZIP & ESL Reports

How Long Should a Zoning Report Take to Prepare? – Tips for Quick Reports

During most commercial real estate transactions, it is likely that the surveyor, lender or title company will require some type of zoning report. In this post, we will offer insight into how long it takes to prepare a zoning report based on your specific needs, as well as options for reports with quicker turnaround times.

Why Does Zoning Take So Long?

There are many steps involved in preparation of a zoning report. If you want to avoid delays in the selling process, it is best to allow two or three weeks within your due diligence time frame for the standard zoning report to be completed. On average, it takes about 10-15 business days to finalize the report. For more information on our Standard Zoning Reports, download our example PDF. The zoning process includes:

  • The project setup
  • Property Research
  • Document retrieval
  • Municipality question respond and follow-up
  • Survey comparison
  • Site analysis
  • Report writing and review

As you can see, the planning and zoning process is very involved and takes time to complete. But what if you don’t have enough time for a complete report?

In Need of a Zoning Report Quick?

If you only need basic zone and district requirements from the surveyor and your time does not permit the standard turnaround time for a full report, Bock & Clark has you covered. Request a Bock & Clark ZIP report to receive a completed report within five business days or less. Components of the ZIP Report include:

  • Setbacks
  • Building height
  • Lot size
  • Coverage
  • Floor area ratio
  • Parking

What’s Included in an Executive Summary?

If you are looking to receive a better snapshot of your property but don’t need municipality documents or in-depth research, a Bock & Clark Executive Summary (ESL) usually takes about a week to complete. In addition to the information included in the ZIP Report, the ESL also includes the comparison of the existing conditions to the current zoning district requirements, as noted on the most recent ALTA survey. The Executive Summary format includes:

  • Current zoning
  • Use permission
  • Table of applicable zoning district code requirements
  • Comparison of current requirements to survey conditions
  • Notice of nonconforming characteristics observed from comparison
  • Optimal code violations report
  • Optimal applicable zoning code excerpts

At Bock & Clark, we are dedicated to preparing standard zoning reports and custom reports for single-site and multi-site projects nationwide. For more information on how we can assist you with all your zoning due diligence needs, request a quote today or contact us.

Fill out the form below to download the handbook.

Form #1 - Redirection to PDF

Form #2 - Sends email containing the link to the PDF

"*" indicates required fields

This field is for validation purposes and should be left unchanged.

eNewsletter - NV5 Real Estate Transaction Services

Contact NV5 Real Estate Transaction Services

Download NV5 2022 Compliance Calendar

Please fill out the form below. After successful form submission, you will be redirected to the requested file. Thank you.

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
We are an equal opportunity employer. All applicants will be considered for employment without attention to race, color, religion, sex, sexual orientation, gender identity, national origin, veteran or disability status. We ensure nondiscrimination in all programs and activities in accordance with Title VI of the United States Civil Rights Act of 1964. If you need more information or special assistance for persons with disabilities or limited English proficiency, contact MaryJo OBrien at (954) 495-2112. Persons with hearing-and speech-impairments can contact the NV5 by using the Virginia Relay Service, a toll-free telecommunication device for the deaf (TDD). Call 711 for TTY/TDD.
This field is hidden when viewing the form

Hyperspectral Imaging - Technically Speaking

Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Accuracy Part 1- Technically Speaking

Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Prune Optimization Webinar Recording

NV5 Geospatial releases a new predictive modeling platform for vegetation management that uses existing lidar and historical data to identify the relative level of asset risk from trees by quantifying the potential for causing asset damage. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Topobathy Lidar - Technically Speaking

Our internal innovation and development team constantly analyzes new technology and develops solutions to meet our client’s challenges. Our Technically Speaking series is one way we share our technical findings with the professional community. 

Please tell us a little about yourself by filling out the form below, and we’ll share the document with you, thanks!

Contact Geospatial

Contact Geospatial