NV5 was responsible for performing Commissioning Management duties on the base build and fit out infrastructure within this retrofitted industrial building.

Whilst the scope was delivered in a single phase, it was part of an expansion to an existing live system, so we were required to coordinate heavily with the operations team to ensure a successful integration.

The project team’s collaborative effort ensured a successful Integrated System Test and handover within the intended programme.

Location

Hong Kong

Client

Confidential

Services

  • Commissioning Management

Key Facts

Building Area: 14,000 m²
IT Load: 4 MW
Completion: 2020