This group is one of the largest car manufacturers in Thailand. They have an existing site which produces approximately 2,000 cars per year.
NV5 was engaged to conduct an energy assessment of the project, and based on the results of this study, to provide operations driven design optimization services for a much larger new assembly line. We also conducted an onsite workshop and provided ongoing design guidance.
Our work helped the client save significant sums on capital equipment and future energy consumption at the new factory.
